This is Dataplot File    DEXNIST.TEX     12/92
 
      DEX Examples at NIST
 
 
Ray Bowen--Dental Adhesion 2**3
BOWEN.DAT
Y = adhesion     Goal: maximize
X1/X2/X3 = agent/cleanser/mordant
 
Ed Krasny--Cigarette Flammability 2**5
KRASNY1.DAT
Y =flammability      Goal: minimize
X1/X2/X3/X4/X5 = citrate conc/paper porosity/fluffed?/tob. type/circumferee
 
Jerry Stenbakken--A/D Converter 2**13
STENBAK1.DAT AND STENBAK2.DAT
Y = theoretical - actual output voltage      Goal: minimize
Xi = setting for bit i
 
Steve Weber--Hospital Energy Modeling 2**5
WEBER.DAT
Y1 = KWH; Y2 = heating MBTU; Y3 = cooling MBTU      Goal: on-target
X1/X2/X3/X4/X5 = light hours/ligt w sq. foot/ roof u/ oa %/ dbst f
 
Ed Fuller--Superconductivity Grain Size Mean Aspect Ratio  2**3
FULLER.DAT
Y = grain size mean aspect ratio       Goal:
X1/X2/X3 = Temperature/Time/O2 Pressure
 
Fred Eichmiller--Dental Tooth Strength 2**3
EICHMILL.DAT
Y = tooth strength to failure      Goal: maximize
X1/X2/X3 = use adhesive?/use st. steel. threaded pin?/use amalgam n?
 
Gordon Lyon--Parallel Processor Exectuion Time 2**(6-2), ..., 2**5)
LYON5.DAT
Y = execution time (= cycle time)      Goal:
Xi = call to sub-procedure i
 
Mike Verkouteren--Mass Spec Graphite Target Production 2**(4-1)
VERKOUT1.DAT
Y = amount of residual carbon in gas      Goal: minimize
X1/X2/X3/X4 = spec. size/iron cat. temp./hyd conc./pre-treat time
 
Sabri Cetinkunt--Low Velocity Lathe Friction Modeling (2**5
CETINK3E.DAT
Y = Distance Travelled      Goal: on target
X1/X2/X3/X4/X5 = table position/direction/side/signal height/signal width
 
Dom Vecchia--Underetching on Superconducting Chips
VECCHIA2.DAT
Y = amount of underetching      Goal: minimize
X1/X2/X3 = power/pressure/oxygen
 
AMRF--VWS Milling Accuracy  2**(7-4)
AMRF.DAT (hypothetical)
Y = hole-to-hole distance      Goal: on-target
X1/.../X7 = table x/table y/feed rate/drill speed/drill id/mat/temp
 
John Martin--Propeller Shaft Surface Material Deposition <future>
(no data as of yet)
Y = surface roughness or void rate or wear      Goal: maximize
X1/.../X5 = material/compressor rate/O2/gas/deposition speed
 
Carol Handwerker--Circuit Board Solderability/Wetting Force
Y1 = time for 2/3 max     Goal: minimize
Y2 = max wetting force    Goal: maximize
Y3 = max withdrawal force     Goal: maximize
X1/X2/X3/X4/X5 = flux type/temperature/time/
                 immersion speed/immersion depth
 
Said Jahanmir--Ceramic Machining
Y1 = strength of resulting ceramic   Y2 = rate of chip removal   Goal: max/max
X1/X2/X3/X4 = grinding wheel grit size/grinding fluid type/
              horizontal table speed/vertical feed rate
 
Subash Malghan--Silicon nitride powder measurement    2**4 with 4 reps
Y = particle size dist. (spectrum)   Goal: reproducible over 4 reps
X1/X2/X3/X4 =
 
Subash Malghan--Milling of Silicon nitride powder
Y =
X1/X2/X3/X4 =
 
Colin Lobo (Concrete mix association)--recycled concrete
Y1 = strength  Y2 = shrinkage   Y3 = water content    Goal: max/min/...
X1/X2/X3/X4 = stabilizer dosage / stabilizer addition rate /
              concrete addition rate / % amount of recycled material
 
Nick Calvano/Dan Frank--Test Methods for Bullet-Proof Vests    2/93
Y = Force for penetration
CALVANO.DAT & CALVANO.DP
X1/X2/X3 = vest condition (dry/wet), vest backing (air, P/E), attack angle (0)
 
Jolene Splett--Eddy Current (NDE) Metal Crack Detection
???
 
Dick Deslattes--
 
Sherry Wood--
Others--contact NIST DEX Course Attendees
 
Walt Rossiter--Lead Paint Encapsulant (= Coating)
Y = Strength
